 
        
        
      
    
    Driveway Permit
A driveway permit from the Town of Washington is required before installing a driveway and if:
- Building a new home or garage (permit is required before any construction begins) 
- First driveway access to property 
- Moving driveway from one location to another 
- Adding a driveway 
Driveway Requirements
- Must be 12’ wide with 16’ clearance for emergency vehicles 
- Must be set back 5’ from property side lot line (unless a shared drive) 
- Must have provision for emergency equipment to turn around if over 50’ long 
- CAUTION – Be sure driveway location does not conflict with your wastewater disposal requirements 
Steps
- Submit form to Town Office 
- Pay $40.00 fee 
- Town checks to see if culvert is needed (to be installed and paid for by applicant) 
- Town issues permit after approval at a Town Board meeting (expires in 1 year if not constructed)